Featured Installation: South Main Apartments-Waterbury, VT

Posted Leave a commentPosted in Commercial Boiler Images, Fröling P4, P4 Pellet Boiler Installations, Pellet Boiler Installations, Wood Pellet Boiler Images

The historic Ladd Hall in Waterbury, VT has gone through a huge makeover. The building was sitting vacant since August 2011, when Tropical Storm Irene hit and flooded the basement. The original  building was bult in the 1890’s with a wing added in the 1950’s to house nurses working at the state hospital. The building […]

Lyme Elementary School Open House with Two Fröling P4 Wood Pellet Boilers

Posted Leave a commentPosted in Commercial Boiler Images, Fröling P4, News Articles, P4 Pellet Boiler Installations, Pictures, Stories, Tarm Biomass News and Events, Wood Pellet Boiler Images

It was a beautiful day for an open house. Below are some pictures and write-up of the event.The New Hampshire Wood Energy Council (NHWEC), Tarm Biomass, Lyme Green Heat, Froling Energy, DCM Logic, and the Lyme School hosted a wood pellet boiler open house on Monday May 4th, 2015. Enjoying glorious spring weather, about 20 […]

Featured P4 Pellet Boiler Installation-The First Congregational Church in Thetford, VT

Posted Leave a commentPosted in Commercial Boiler Images, Installations, P4 Pellet Boiler Installations, Pictures, Wood Pellet Boiler Images

Equipment: Fröling P4 48/60 with a 400 gallon storage tank and auger vacuum system.Building: Church and Day Care Center. Church was built in 1787.System Installed by: Roger Carpenter Services 5551 Route 5 Thetford, VT 802.333.7171It was time to update the heating system in the 226 year old church. The church has a long history and […]

The First Fröling P4 Pellet Boiler 80/100 Installation

Posted Leave a commentPosted in Commercial Boiler Images, Fröling P4, Installations, P4 Pellet Boiler Installations, Stories, Tarm Biomass News and Events, Wood Pellet Boiler Images

The newest and largest P4 Pellet boiler is the P4 Pellet 80/100. A commercial grade, ASME certified boiler with a heat output range between 80,000-341,000 Btu/hr per boiler. When 4 boilers are cascaded together it can have a heat output range of 80,000-1.4MM Btu/hr. This is perfect for mid-sized commercial buildings. These three boilers are […]

Featured Installation-Fröling P4 Wood Pellet Boiler System at the Weiser Forest Resource Management Center

Posted 1 CommentPosted in Commercial Boiler Images, Fröling P4, Installations, P4 Pellet Boiler Installations, Pictures, Products, Wood Pellet Boiler Images

Equipment: Fröling P4 32/38 and a Fröling P4 20/25 cascaded together. One 400 gallon storage tank.Building: 10,000 sq. ft office/lobby/meeting rooms and a 5,000 sq. ft garage.System Sold By: ATI Systems, Conestoga, PA 17516 (717) 871-9851 Contact: Carl LongeneckerThe new LEED certified Environmental Resource Management Center has just opened replacing an outdated 2,755 sq. ft […]