  Equipment: Four Fröling TX 150 wood pellet/chip boilers connected to a 4000 gallon thermal storage tank. Each boiler has it’s own bulk store room. The rooms can either be filled with wood pellets or chips. The boilers can switch fuels with just minor equipment adjustments.Building: The boilers are heating a new 90,000 sq. ft […]

Commissioning Is Now Complete For The First Fröling TX 150 Wood Pellet Boilers

Posted Leave a commentPosted in Commercial Boiler Images, Fröling TX 150, Fröling TX 150 Installations, Installations, Stories

The three Fröling TX 150 wood chip/wood pellet boilers installed at the Stowe VT Middle/High School have gone through a week long commissioning schedule and are now ready to operate. The three boilers are connected to a 500 gallon buffer tank can produce up to 1.5 MM Btu/hr. The boilers are set-up to operate on […]

The First Three Fröling TX 150 Wood Pellet boilers are getting ready to go on-line

Posted Leave a commentPosted in Fröling TX 150, Fröling TX 150 Installations, Installations, Stories, Technology

The first three Fröling TX 150 (500,000Btuh) wood chip/wood pellet boilers are almost ready to go live. The three boilers are located at the Middle and High School in Stowe, Vt. The three boilers will be able to produce up to 1.5 million btuh and will be burning wood pellets for fuel. The fuel is […]